How to measure the effectiveness of automation

The method we use in client audits.

"We automated the process" is not a result. The result is a number before and after.

We use three metrics on every project: process lead time, the share of manual switches, and the share of re-entered data.

Lead time is measured from the first event to the last: for example, from a customer request to shipment. Before automation we take measurements on a sample of 50 cases. After, on the same sample.

Manual switches: how many times an employee moves between systems and interfaces for a single task. Cutting this in half often gives more effect than speeding up each step.

Re-entry: how many fields are filled in by hand even though the data is already in the system. It's the most stable ROI indicator: a 40% reduction gives roughly 1 hour a day per employee.

Tell us
about your task.
We'll build the system.

An audit and architecture review usually takes 2 weeks. You get a ready roadmap, even if we don't sign a contract.

Start a conversation →